Current funding calls
under the Renewable Energy Expansion Act (EAG)

1. Funding call 

Category A: 21.04.2022 - 19.05.2022
Category B, C and D: 21.04.2022 - 02.06.2022

2. Funding call 

Category A and B: 21.06.2022 - 19.07.2022

 

3. Funding call 

Category A : 23.08.2022 - 20.09.2022
Category B, C and D: 23.08.2022 - 04.10.2022

4. Funding call 

Category A : 18.10.2022 - 15.11.2022
Category B, C and D: 18.10.2022 - 29.11.2022

Changes through
Renewable Energy Expansion Act (EAG)

In response to the looming climate crisis, the current government has decided that Austria should become climate-neutral by 2040. Electricity, on the other hand, is to be generated exclusively from renewable energies as early as 2030. The legal basis for this has now been laid with the recently passed Renewable Expansion Act (EAG).

Just how ambitious these goals are becomes clear when one looks at the figures: in order to be able to cover the entire electricity demand on the balance sheet from 2030, an increase of 27 terawatt hours (TWh) is necessary, 11 TWh of which is solar energy alone. This corresponds to a tenfold increase in currently installed capacity (1.6 GW in 2019).

The following innovations are included in the EAEC:

  • New support system for PV systems and electricity storage systems
  • Facilitation and flat-rate costs for grid access
  • Energy communities are made possible
  • Regulatory freedom for research & demonstration projects

Subject
for investments:

  • PV systems that are newly erected or expanded
  • Storage as a new installation in connection with the new installation or expansion of PV systems.
    -> Storage units alone are NOT subsidised
  • Hydropower plants through new construction and/or revitalisation
  • New construction of wind turbines
  • New construction of biomass plants

Would you like to receive information about the funding process?

Requirements
for funding:

  • Combination with Climate and Energy Fund funding not possible
  • All necessary approvals or required documents must be available in the first instance at the time of Submission of the funding application
  • Construction must start after funding application
  • In the case of ground-mounted systems, it must be ensured that the system can be dismantled without leaving any residues.
  • For ground-mounted systems, the distance between the lower edge of the module and the ground must be at least 80 cm.
  • Row distances between opposing module surfaces must be at least 2 m.
Förderungen für PV-Anlagen und Speicher

In total, there are

€160 million available

There is an extra 30% surcharge for innovative PV systems. Deduction for ground-mounted systems of -25% on land previously used for agricultural purposes (if used only for PV) and on land.

Innovative
Building Integrated Systems

 Installations with any of the following functions are strongly encouraged:

  • Mechanical stiffness or structural integrity
  • Primary weather protection
  • Shading, daylight or thermal insulation
  • Fire protection & noise protection
  • Separation between indoor and outdoor areas
  • Protection or security
  • Floating PV systems
  • PV systems as car park roofing for at least 10 parking spaces
  • PV on noise barriers and walls

Need help with the process?

Just write to us and we will get in touch with you as soon as possible!

Inquire now

Checkliste für Fördereinreichungen

For preparation

on a promotion

  1. Name, address, telephone number, e-mail, bank details of the funding applicant
  2. Name and size of the company
  3. Description of the project with start and completion dates
  4. Location
  5. Costs
  6. Technical project support
  7. Proof of connection to the public grid
  8. Compilation of the investment costs
  9. Proof of the required permits/notifications
icon_clock_c

Deadlines

For commissioning

 
  • 6 (max. 9) months for systems up to 100 kWp
  • 12 (max. 18) months for systems of 100 kWp or more

...and
for the final account

You should already have prepared something here:

  • Bills
  • Proof of payment
  • Proof of commissioning
  • Complete test report of an authorised contractor
  • Photos of the system including the inverter and the entire system
  • Grid access contract

Take the first step now
on the way to the energy transition...



 

Get in touch

Are you interested in innovative neoom energy and charging solutions? Then get in touch with us and our neoom experts will be happy to advise you.

Get in touch

Are you interested in innovative neoom energy and charging solutions? Then get in touch with us and our neoom experts will be happy to advise you.

Neoom World